Skip to content

Deployment verification

The deployment guide owns the operator procedure. An offline migration requires downtime and its documented recovery procedure; rolling-compatible test results from older releases do not override that rule.

Proxy availability checks

The rollout test allows one retry of a read-only health/readiness probe after a pre-response Caddy disconnect, within the original seven-second deadline. It reports retries separately. HTTP errors, connection refusal, timeouts, partial responses, and repeated disconnects fail the test. This checks HTTP availability, not uninterrupted TCP connections or safe replay of writes.

Historical adoption and adjacent releases

scripts/test-single-host-zero-downtime.sh adopts a pinned v0.0.1 installation through the required offline migration, then checks subsequent rolling updates of the migrated installation. Its name does not mean the initial migration is free of downtime. The old release combines API and worker processes, so drain its tasks and stop its writers before migration.

scripts/test-adjacent-release-upgrade.sh resolves the latest stable release by immutable image digest and seeds representative data through its API. After draining the worker, the candidate's migration preflight chooses the test path:

  • Rolling: keep the old API available, exercise reads and writes through both versions after migration, and test an application-only rollback.
  • Offline: stop the old API, snapshot PostgreSQL, and migrate with no old writers. Recovery restores that snapshot before starting the old binaries.

Both paths verify worker operation and return to the candidate. The test also checks backup creation and isolated restores. Its evidence applies to the specific tested versions and migration mode; it does not establish compatibility with every older release or a database downgrade path.